Below are ctdot guide detail sheets which can be used for contract plans.
Ct dot sheet aluminum sign installation.
Connecticut residents are urged to continue taking precautions to prevent the spread of covid 19.
4 panel if the 4 panel sign is full it is possible to change the 4 panel sign to a 6 panel sign.
Additionally all old exit panels on i 395 ct 2a and s r.
Tr gds index c o nect i c u t d e p a r t m e n t of tr a s p o t a t i o n border version.
The division of traffic engineering will continuously update the sign catalog as revisions are made.
An aluminum substrate with a reflective surface.
These documents have been digitally signed and are approved for use in state of ct projects.
6 panel if the 6 panel sign is full bumping rights are based on the closest six 6 qualified businesses from the off ramp.
Standard sheets in highways and traffic disciplines have been digitally signed and are approved for use in state of ct projects with fdp dates after november 2 2009.
The sign catalog is for informational purposes only.
Department of transportation state of connecticut filename.
Highway standard drawings webpage dedicated to providing the latest ctdot standard sheets and guide sheets.
Office of engineering revised or added guide sheet index traffic engineering tr gs 02 sign face sheet aluminum s w series typical sign.
Backfill shall be thoroughly tamped after the posts have been set.
After your sign is completed our installer will install it with care.
11 14 08 guide sheet no.
The types of signs that will be replaced include but are not limited to mile markers exit gore signs speed limit signs merge signs and route confirmation signs.
Stay informed about coronavirus covid 19.
Next the craftsmen of signcraft whether artists wood carvers sign painters or sheet metal fabricators will create your sign to your specifications.
For the latest information visit ct gov coronavirus.
The connecticut department of transportation department is developing plans to replace sheet aluminum highway signs along limited access highways statewide.
Or the base post installation in ledge detail shall apply.
The sign details located on projectwise are to be used for sign fabrication.
As of 9 1 2019 we are unaware of any mandatory no cell phone sign postings required in connecticut.
The 2009 mutcd shall be used to determine the appropriate signs.
The connecticut dot approved standard drawing files for roadway design on this page are in adobe portable document format pdf.